1. Project Overview This project is a customized solution provided by Nankee Electric for PT. Trafoindo Prima Perkasa. It is the 8th set of semi-automatic intelligent transformer test systems purchased by the customer in 2025, mainly used for the rou...
This project is a customized solution provided by Nankee Electric for PT. Trafoindo Prima Perkasa. It is the 8th set of semi-automatic intelligent transformer test systems purchased by the customer in 2025, mainly used for the routine test of dry-type distribution transformers before delivery.The system adopts a staged wiring mode for load and no-load tests, balancing test accuracy and operational convenience, meeting the customer's demands for large-scale and high-efficiency production quality inspection.
34.5/0.4kV, 15000 kVA and below dry-type transformer, impedance 4% -14%;
6/0.4kV, 10000 kVA and below dry type transformer, impedance 4% -14%;
Maximum loss: 180 kW.
Transformer no-load loss and no-load current measurement;
Transformer no-load current percentage calculation;
Transformer load loss measurement and conversion according to the standard temperature (100% current);
Transformer short-circuit impedance measurement and standard temperature conversion;
Transformer induction and voltage withstand test;
Transformer power frequency withstand voltage test;
Transformer partial discharge test.
Semi-automatic staged wiring for flexible operation, adapting to the customer's existing production process
Integrated high-precision measuring instruments with stable and reliable data, complying with international and Indonesian local standards
Supports customized test reports, compatible with the customer's production management system
Rapid delivery of mature solutions, providing one-stop on-site commissioning and training services
Customer: PT. Trafoindo Prima Perkasa (Jakarta, Indonesia)
Commissioning Time: January 2026
Operation Status: Installation and commissioning completed, stably serving mass production inspection