Semi-Automatic Intelligent Transformer Test System for PT. Trafoindo Prima Perkasa

1. Project Overview This project is a customized solution provided by Nankee Electric for PT. Trafoindo Prima Perkasa. It is the 8th set of semi-automatic intelligent transformer test systems purchased by the customer in 2025, mainly used for the rou...

Semi-Automatic Intelligent Transformer Test System for PT. Trafoindo Prima Perkasa

1. Project Overview

This project is a customized solution provided by Nankee Electric for PT. Trafoindo Prima Perkasa. It is the 8th set of semi-automatic intelligent transformer test systems purchased by the customer in 2025, mainly used for the routine test of dry-type distribution transformers before delivery.The system adopts a staged wiring mode for load and no-load tests, balancing test accuracy and operational convenience, meeting the customer's demands for large-scale and high-efficiency production quality inspection.

2. Maximum Test Capacity of This Project

34.5/0.4kV, 15000 kVA and below dry-type transformer, impedance 4% -14%;

6/0.4kV, 10000 kVA and below dry type transformer, impedance 4% -14%;

Maximum loss: 180 kW.

3. Test Items

Transformer no-load loss and no-load current measurement;

Transformer no-load current percentage calculation;

Transformer load loss measurement and conversion according to the standard temperature (100% current);

Transformer short-circuit impedance measurement and standard temperature conversion;

Transformer induction and voltage withstand test;

Transformer power frequency withstand voltage test;

Transformer partial discharge test.

4. Project Highlights

Semi-automatic staged wiring for flexible operation, adapting to the customer's existing production process

Integrated high-precision measuring instruments with stable and reliable data, complying with international and Indonesian local standards

Supports customized test reports, compatible with the customer's production management system

Rapid delivery of mature solutions, providing one-stop on-site commissioning and training services

5. Operation Information

Customer: PT. Trafoindo Prima Perkasa (Jakarta, Indonesia)

Commissioning Time: January 2026

Operation Status: Installation and commissioning completed, stably serving mass production inspection

  • 1. Project Overview
  • 1. Project Overview
  • 1. Project Overview
  • 1. Project Overview
  • 1. Project Overview
  • 1. Project Overview
Prev

Fully Automatic Intelligent Transformer Test System for Wuxi Yinow Electric Equipment Co., Ltd.8th Intelligent Test Station (Part 1)Online Dry-Type Transformer One-Time Wiring Test System

All applications Next

TEBA (Xinjiang)

RELATED PRODUCT

email goToTop