Get a Free Quote

Tell us your needs, we will reply with a customized solution within 24 hours!
Name
Email
Tel
WhatsApp
Company Name
Please provide the main parameters of your transformer
0/1000
Routine Tests
Please ☑ the boxes for required test items
Type or Special Tests
Please ☑ the boxes for required test items
Message
0/1000
fully automatic transformer intelligent test system project for oil immersed transformer nanke electric cooperates with zhejiang power transformer co ltd-0

Solution

Home >  Solution

Fully Automatic Transformer Intelligent Test System Project for Oil-immersed transformer |Nanke Electric Cooperates with Zhejiang Power Transformer Co., Ltd.

✅ Classic Project Case In 2021, Nanke Electric customized a fully automatic transformer intelligent test system for Zhejiang Power Transformer Co., Ltd. The client is a national high-tech enterprise and a national specialized, refined, distinctive an...

Fully Automatic Transformer Intelligent Test System Project for Oil-immersed transformer |Nanke Electric Cooperates with Zhejiang Power Transformer Co., Ltd.

✅ Classic Project Case

In 2021, Nanke Electric customized a fully automatic transformer intelligent test system for Zhejiang Power Transformer Co., Ltd.

The client is a national high-tech enterprise and a national specialized, refined, distinctive and innovative "Little Giant" enterprise.

It specializes in the R&D and manufacturing of transformers up to 110kV, and focuses on the electrical equipment industry.

  • ✅ Classic Project Case
  • ✅ Classic Project Case

⚙️ Core Advantages

Fully automatic assembly line testing; one-time wiring enables full-process automatic operation without manual intervention.

Equipped with intelligent temperature conversion function to ensure accurate test data and stable reliable performance.

📊Maximum Test Capacity

Oil-immersed transformer pipeline test area: Power transformers

Capacity Range: 30kVA–2500kVA

Voltage Class: Primary 20.00kV, Secondary 0.4kV

Short-circuit Impedance: 10% and below

💬 Customer Feedback

Since adopting the system in 2021, the client has highly recognized our equipment performance and after-sales service, and purchased additional industrial computers in 2026.

The system runs stably long-term and greatly reduces manual workload. Our service response is timely and efficient.

The client fully recognizes Nanke Electric's strength and will give priority to choosing our complete set of testing equipment for future projects.

  • ✅ Classic Project Case
  • ✅ Classic Project Case
  • ✅ Classic Project Case
  • ✅ Classic Project Case
Prev

None

All applications Next

Fully Automatic Transformer Intelligent Test System for XD Jinan Transformer Co., Ltd.

RELATED PRODUCT

email goToTop